Solid waste advisor, Brian McCarthy, a Scottish contractor with RTI International, Kirkuk Provincial Reconstruction Team, speaks with the site construction manager about the leach ate system which will drain liquid residue from the first active landfill that meets U.S. Environmental Protection Agency standards in Iraq, Zindana sector, Taza, Kirkuk province, Dec. 16, 2007. The landfill is scheduled to be in full operation by by February 2008. U.S. Army Soldiers from Delta Company, 2nd Brigade, 22nd Infantry Regiment, 10 Mountain Division, escort McCarthy and conduct security during his assessment. (U.S. Air Force Photo/Staff Sgt. Samuel Bendet)
Date Taken: | 12.16.2007 |
Date Posted: | 08.18.2011 14:28 |
Photo ID: | 75557 |
VIRIN: | 071216-F-1936B-020 |
Resolution: | 4288x2848 |
Size: | 1.56 MB |
Location: | KIRKUK, IQ |
Web Views: | 103 |
Downloads: | 12 |
This work, First active landfill meets U.S. EPA standards in Iraq [Image 9 of 9], by TSgt Samuel Bendet, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.