Zana Group, an Iraqi sub contractor, with RTI International, Kirkuk Provincial Reconstruction Team, roll out 1.5 mm plastic lining spanning 600 meters by 300 meters during the construction of the first active landfill that meeting U.S. Environmental Protection Agency standards in Iraq, Zindana Sector, Taza, Kirkuk province, Dec. 16, 2007. The landfill is scheduled to be operational in February, 2008. (U.S. Air Force Photo/Staff Sgt. Samuel Bendet)
Date Taken: | 12.16.2007 |
Date Posted: | 08.18.2011 15:42 |
Photo ID: | 75562 |
VIRIN: | 071216-F-1936B-109 |
Resolution: | 4288x2848 |
Size: | 1.01 MB |
Location: | KIRKUK, IQ |
Web Views: | 38 |
Downloads: | 5 |
This work, First active landfill meets U.S. EPA standards in Iraq [Image 9 of 9], by TSgt Samuel Bendet, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.