Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    First active landfill meets U.S. EPA standards in Iraq [Image 5 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    First active landfill meets U.S. EPA standards in Iraq

    Zana Group, an Iraqi sub contractor with RTI International, Kirkuk Provincial Reconstruction Team, shovel two feet of gravel across a liner 600 meter by 300 meter during the construction of the first active landfill that meets U.S. Environmental Protection Agency standards in Iraq, Zindana sector, Taza, Kirkuk province, Dec. 16, 2007. The landfill is scheduled to be in operation February, 2008. (U.S. Air Force Photo/Staff Sgt. Samuel Bendet)

    IMAGE INFO

    Date Taken: 12.16.2007
    Date Posted: 08.18.2011 15:26
    Photo ID: 75560
    VIRIN: 071216-F-1936B-052
    Resolution: 4288x2848
    Size: 2.85 MB
    Location: KIRKUK, IQ

    Web Views: 59
    Downloads: 9

    PUBLIC DOMAIN