A B-1B Lancer, tail number 86-0094, is moved across Douglas
Blvd. to the Maintenance Repair and Overhaul Technology Center (MROTC) to receive an initial portion of Gate 1 of programmed depot maintenance April 21. 567th AMXS personnel will perform three days of maintenance which include single system checks on 40 individual actuators validating voltage outputs as
well as interrogating each actuator for hydraulic leaks. After single systems are completed, the horizontal stabilizers will be removed from the aircraft. This is the first time that horizontal stabilizers have ever been removed at the MROTC. Once complete, the aircraft and horizontal stabilizers will be brought back across Douglas to the 569th AMXS strip facility for plastic media blasting. Once stripped, the horizontal stabilizers will be routed to the 76th Commodities Maintenance Group for overhaul and repairs. (U.S. Air Force photo/Kelly White)
Date Taken: | 04.21.2020 |
Date Posted: | 09.03.2020 14:54 |
Photo ID: | 6210041 |
VIRIN: | 200421-F-RI777-1022 |
Resolution: | 2329x2881 |
Size: | 1.34 MB |
Location: | TINKER AIR FORCE BASE, OKLAHOMA, US |
Web Views: | 41 |
Downloads: | 25 |
This work, B-1B stabilized move [Image 61 of 61], by Kelly White, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.