Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineers continue essential MILCON work despite COVID-19 [Image 48 of 61]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineers continue essential MILCON work despite COVID-19

    TINKER AIR FORCE BASE, OKLAHOMA, UNITED STATES

    04.23.2020

    Photo by Kelly White 

    72nd Air Base Wing

    The second major structure on the KC-46A Pegasus campus, a two-bay maintenance hangar, is nearing completion. Interior concrete is complete, sheetrock and paint on walls and exterior airfield pavement are nearing completion. Electrical work is ongoing, as is work on the fire protection systems and the fire water storage tank. (U.S. Air Force photo/Kelly White)

    IMAGE INFO

    Date Taken: 04.23.2020
    Date Posted: 06.10.2020 16:53
    Photo ID: 6210054
    VIRIN: 200423-F-RI777-1021
    Resolution: 3802x2534
    Size: 2.13 MB
    Location: TINKER AIR FORCE BASE, OKLAHOMA, US

    Web Views: 31
    Downloads: 38

    PUBLIC DOMAIN