Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE Performs Electrical Assessments on Critical Infrastructure [Image 27 of 39]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:

    CAMDEN, NEW JERSEY, UNITED STATES

    05.31.2024

    Photo by Patrick Bloodgood 

    U.S. Army Corps of Engineers Headquarters

    (CAMDEN, NJ) – New Jersey Congressman Donald Norcross observes Soldiers with 249th Engineer Battalion as they perform an electrical assessment occurring at the Cooper Medical Center on May 31. The battalion is performing 300 assessments to critical infrastructure throughout New Jersey as part of a regional training exercise. These assessments help determine requirements and expedite generator installations at critical lifesaving and life sustaining locations like hospitals, shelters, or water distribution sites, which enable short-term power restoration for communities while the more permanent power sources are being restored during a national disaster response. (U.S. Army photo by Patrick Bloodgood)

    IMAGE INFO

    Date Taken: 05.31.2024
    Date Posted: 06.03.2024 14:01
    Photo ID: 8446811
    VIRIN: 240531-A-OI229-4639
    Resolution: 5000x3000
    Size: 0 B
    Location: CAMDEN, NEW JERSEY, US

    Web Views: 20
    Downloads: 1

    PUBLIC DOMAIN