Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Makin Island Maintenance [Image 30 of 35]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Makin Island Maintenance

    220903-N-DP708-1020

    PACIFIC OCEAN (Sept. 3, 2022) – Machinist’s Mate 1st Class Jesse Johnson, left, and Information Systems Technician 1st Class Gage Hanby replace the mechanical seal on an air conditioning unit aboard amphibious assault ship USS Makin Island (LHD 8), Sept. 3. Replacing the mechanical seal prevents oil loss that can result in structural damage and equipment failure. The Makin Island Amphibious Ready Group, comprised of amphibious assault ship USS Makin Island (LHD 8) and amphibious transport docks USS Anchorage (LPD 23) and USS John P. Murtha (LPD 26), is underway conducting integrated training operations with the 13th MEU in the U.S. 3rd Fleet to prepare for an upcoming deployment. (U.S. Navy photo by Mass Communications Specialist 3rd Class Analice C. Baker)

    IMAGE INFO

    Date Taken: 09.03.2022
    Date Posted: 09.21.2022 20:36
    Photo ID: 7419332
    VIRIN: 220903-N-DP708-1020
    Resolution: 5771x4263
    Size: 1001.36 KB
    Location: PACIFIC OCEAN

    Web Views: 29
    Downloads: 6

    PUBLIC DOMAIN