Runway 05/23 at Marine Corps Air Station Beaufort officially opened Aug. 2 after the completeion of maintenance to the landing surfaces. The goal of the maintenance, which began in March, was to improve the landing surfaces so the pilots can operate on the most structurally sound runway, enhancing mission accomplishment.
Date Taken: | 03.21.2016 |
Date Posted: | 08.04.2016 00:13 |
Photo ID: | 2766342 |
VIRIN: | 160321-M-OM791-004 |
Resolution: | 5760x3840 |
Size: | 1.27 MB |
Location: | MARINE CORPS AIR STATION BEAUFORT, SOUTH CAROLINA, US |
Web Views: | 13 |
Downloads: | 95 |
This work, MCAS Beaufort runway open, maintenance complete [Image 867 of 867], by Kayla Rainbolt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
No keywords found.