Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide [Image 308 of 1217]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide

    NORFOLK, VIRGINIA, UNITED STATES

    09.11.2016

    Photo by Petty Officer 2nd Class Spencer Fling    

    U.S. Navy           

    160912-N-PL946-001
    NORFOLK (Sept. 11, 2016) Mass Communication Specialist 3rd Class Patrick Crimmins, left, and Aviation Boatswain Mate (Equipment) Airman Mustafa Muhammad perform evening colors aboard the aircraft carrier USS George H.W. Bush (CVN 77). George H.W. Bush is currently conducting training and qualifications for an upcoming deployment. (U.S. Navy photo by Mass Communication Specialist 2nd Class Spencer Fling/Released)

    IMAGE INFO

    Date Taken: 09.11.2016
    Date Posted: 09.20.2016 09:56
    Photo ID: 2864231
    VIRIN: 160912-N-PL946-001
    Resolution: 4928x3280
    Size: 1.29 MB
    Location: NORFOLK, VIRGINIA, US

    Web Views: 26
    Downloads: 143

    PUBLIC DOMAIN