Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide [Image 705 of 1217]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide

    USS GEORGE H.W. BUSH (CVN 77), N/A, UNITED STATES

    09.14.2016

    Photo by Petty Officer 3rd Class Justin DiNiro 

    U.S. Navy           

    160914-N-ZY039-064 ATLANTIC OCEAN (Sept. 14, 2016) Aviation Structural Mechanic 2nd Class Beverly Prince conducts maintenance on an MH-60R Seahawk assigned to the "Spartans" of Helicopter Maritime Strike Squadron (HSM) 70 aboard aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide range of mission-critical operations. (U.S. Navy photo by Mass Communication Specialist Seaman Justin R. DiNiro/ Released)

    IMAGE INFO

    Date Taken: 09.14.2016
    Date Posted: 09.20.2016 10:21
    Photo ID: 2865470
    VIRIN: 160914-N-ZY039-064
    Resolution: 4928x3280
    Size: 856.51 KB
    Location: USS GEORGE H.W. BUSH (CVN 77), N/A, US

    Web Views: 12
    Downloads: 138

    PUBLIC DOMAIN