Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide [Image 843 of 1217]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide

    USS GEORGE H.W. BUSH (CVN 77), N/A, UNITED STATES

    09.14.2016

    Photo by Petty Officer 3rd Class Justin DiNiro 

    U.S. Navy           

    160914-N-ZY039-007 ATLANTIC OCEAN (Sept. 14, 2016) Hull Maintenance Technician Fireman Justin Kluss grinds down a metal wedge in the hangar bay aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide range of mission-critical operations. (U.S. Navy photo by Mass Communication Specialist Seaman Justin R. DiNiro/ Released)

    IMAGE INFO

    Date Taken: 09.14.2016
    Date Posted: 09.20.2016 10:29
    Photo ID: 2865890
    VIRIN: 160914-N-ZY039-007
    Resolution: 3497x2498
    Size: 873.87 KB
    Location: USS GEORGE H.W. BUSH (CVN 77), N/A, US

    Web Views: 3
    Downloads: 138

    PUBLIC DOMAIN